---
agent:
  instructions: "Use this search API to find relevant content across this site with keywords or natural-language queries, instead of crawling individual pages. Results are returned in Markdown."
  endpoint: "https://leadservicelinecontractors.com/.well-known/search?q={query}"
  method: "GET"
  documentation: "https://developers.cloudflare.com/ai-search/how-to/search-for-agents/"
title: "Contractors bidding public and private lead service lines"
description: "12 profiled contractors appear on bids covering both public and private service line work in Lexington, East Moline and Jackson."
image: "https://leadservicelinecontractors.com/og.jpg"
url: "https://leadservicelinecontractors.com/public-and-private/"
last_updated: "2026-11-28"
---

> Site index for agents: https://leadservicelinecontractors.com/llms.txt

# Contractors bidding public and private lead service lines

12 profiled contractors appear on bids covering both public and private service line work in Lexington, East Moline and Jackson. Those schedules separate work at the main or curb box from work on the customer side, giving utilities a starting point for a full-line shortlist. [Lexington bid schedule](https://www.lexingtonma.gov/DocumentCenter/View/14831/Lexington-Lead-Serivce-Line-Replacement-Project---Bid-Tabulation-and-Check-List?bidId=) · [East Moline bid schedule](https://www.eastmoline.com/DocumentCenter/View/8335/Bid-Tab-002-2026-Lead-Service-Line-Replacement-Plan--Phase-2?bidId=) · [Jackson bid schedule](https://www.cityofjackson.org/DocumentCenter/View/14448/Bid-Tabulation---ENG-26-06-DWSRF-PHASE-3-LEAD-SERVICE-LINE-REPLACEMENTSpdf)

## Contractor records

*   [A.D. Paolini LLC](https://leadservicelinecontractors.com/ad-paolini/)
*   [C. Naughton Corp.](https://leadservicelinecontractors.com/cnaughton/)
*   [Commonwealth Construction & Utilities Inc.](https://leadservicelinecontractors.com/commonwealth-construction-utilities/)
*   [Five Star Energy Services](https://leadservicelinecontractors.com/five-star-energy-services/)
*   [J.C. Dillon Inc.](https://leadservicelinecontractors.com/jc-dillon/)
*   [Joseph P. Cardillo & Son Inc.](https://leadservicelinecontractors.com/cardillo-and-son/)
*   [LGC Global Inc.](https://leadservicelinecontractors.com/lgc-global/)
*   [M. DiStasio Excavation Inc.](https://leadservicelinecontractors.com/m-distasio/)
*   [Mass Pipeline Services Inc.](https://leadservicelinecontractors.com/mass-pipeline-services/)
*   [Murphy Pipeline Contractors](https://leadservicelinecontractors.com/murphy-pipelines/)
*   [Precision Pipeline LLC](https://leadservicelinecontractors.com/precision-pipeline/)
*   [Super Construction LLC](https://leadservicelinecontractors.com/super-construction/)

Include the utility, project location, line count, limits of work, restoration standard and target start date.

## Request quotes for your replacement program

Skip the one-by-one emails: Lead Service Line Contractors routes your brief to matching contractors, who answer you directly.

Brief received by Lead Service Line Contractors. Matching contractors reply to your inbox.

Your request didn't go through. Check your email address and try sending it to Lead Service Line Contractors again, or reach us at [hello@leadservicelinecontractors.com](mailto:hello@leadservicelinecontractors.com).

## Questions buyers ask

### How does Jackson break out service line scope?

Jackson lists curb-box-to-house work separately from main-to-curb-box work, with line items by pipe diameter. [Source](https://www.cityofjackson.org/DocumentCenter/View/14448/Bid-Tabulation---ENG-26-06-DWSRF-PHASE-3-LEAD-SERVICE-LINE-REPLACEMENTSpdf)

### What tubing did Lexington specify in the bid tab?

Lexington listed Type K copper tubing on both sides, measured per linear foot. [Source](https://www.lexingtonma.gov/DocumentCenter/View/14831/Lexington-Lead-Serivce-Line-Replacement-Project---Bid-Tabulation-and-Check-List?bidId=)

### What should the RFQ say about restoration?

Spell out pavement and landscape restoration and list the surfaces affected. East Moline’s bid schedule shows separate items for pavement, curb, sidewalk and surface work. [Source](https://www.eastmoline.com/DocumentCenter/View/8335/Bid-Tab-002-2026-Lead-Service-Line-Replacement-Plan--Phase-2?bidId=)

```json
{"@context":"https://schema.org","@graph":[{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Contractor directory","item":"https://leadservicelinecontractors.com/"},{"@type":"ListItem","position":2,"name":"Public and private packages","item":"https://leadservicelinecontractors.com/public-and-private/"}]},{"@type":"ItemList","@id":"https://leadservicelinecontractors.com/public-and-private/#list","name":"Contractors bidding public and private lead service lines","numberOfItems":12,"itemListOrder":"https://schema.org/ItemListUnordered","itemListElement":[{"@type":"ListItem","position":1,"name":"A.D. Paolini LLC","url":"https://leadservicelinecontractors.com/ad-paolini/"},{"@type":"ListItem","position":2,"name":"C. Naughton Corp.","url":"https://leadservicelinecontractors.com/cnaughton/"},{"@type":"ListItem","position":3,"name":"Commonwealth Construction & Utilities Inc.","url":"https://leadservicelinecontractors.com/commonwealth-construction-utilities/"},{"@type":"ListItem","position":4,"name":"Five Star Energy Services","url":"https://leadservicelinecontractors.com/five-star-energy-services/"},{"@type":"ListItem","position":5,"name":"J.C. Dillon Inc.","url":"https://leadservicelinecontractors.com/jc-dillon/"},{"@type":"ListItem","position":6,"name":"Joseph P. Cardillo & Son Inc.","url":"https://leadservicelinecontractors.com/cardillo-and-son/"},{"@type":"ListItem","position":7,"name":"LGC Global Inc.","url":"https://leadservicelinecontractors.com/lgc-global/"},{"@type":"ListItem","position":8,"name":"M. DiStasio Excavation Inc.","url":"https://leadservicelinecontractors.com/m-distasio/"},{"@type":"ListItem","position":9,"name":"Mass Pipeline Services Inc.","url":"https://leadservicelinecontractors.com/mass-pipeline-services/"},{"@type":"ListItem","position":10,"name":"Murphy Pipeline Contractors","url":"https://leadservicelinecontractors.com/murphy-pipelines/"},{"@type":"ListItem","position":11,"name":"Precision Pipeline LLC","url":"https://leadservicelinecontractors.com/precision-pipeline/"},{"@type":"ListItem","position":12,"name":"Super Construction LLC","url":"https://leadservicelinecontractors.com/super-construction/"}]}]}
{"@context":"https://schema.org","@type":"FAQPage","mainEntity":[{"@type":"Question","name":"How does Jackson break out service line scope?","acceptedAnswer":{"@type":"Answer","text":"Jackson lists curb-box-to-house work separately from main-to-curb-box work, with line items by pipe diameter."}},{"@type":"Question","name":"What tubing did Lexington specify in the bid tab?","acceptedAnswer":{"@type":"Answer","text":"Lexington listed Type K copper tubing on both sides, measured per linear foot."}},{"@type":"Question","name":"What should the RFQ say about restoration?","acceptedAnswer":{"@type":"Answer","text":"Spell out pavement and landscape restoration and list the surfaces affected. East Moline’s bid schedule shows separate items for pavement, curb, sidewalk and surface work."}}]}
```
