---
agent:
  instructions: "Use this search API to find relevant content across this site with keywords or natural-language queries, instead of crawling individual pages. Results are returned in Markdown."
  endpoint: "https://leadservicelinecontractors.com/.well-known/search?q={query}"
  method: "GET"
  documentation: "https://developers.cloudflare.com/ai-search/how-to/search-for-agents/"
title: "What do municipal lead service line replacement bids cost?"
description: "East Moline’s Phase 2 tab shows $1,800–$3,475 per customer-side service item across four bids, with base bids of $3,644,423–$6,591,809."
image: "https://leadservicelinecontractors.com/og.jpg"
url: "https://leadservicelinecontractors.com/bid-costs/"
last_updated: "2026-11-28"
---

> Site index for agents: https://leadservicelinecontractors.com/llms.txt

# What do municipal lead service line replacement bids cost?

[East Moline’s Phase 2 tab shows $1,800–$3,475 per customer-side service item across four bids, with base bids of $3,644,423–$6,591,809.](https://www.eastmoline.com/DocumentCenter/View/8335/Bid-Tab-002-2026-Lead-Service-Line-Replacement-Plan--Phase-2?bidId=) [Lexington’s six base bids ran $1,293,785.65–$1,848,750.](https://www.lexingtonma.gov/DocumentCenter/View/14831/Lexington-Lead-Serivce-Line-Replacement-Project---Bid-Tabulation-and-Check-List?bidId=) The two tabs price different packages and give buyers dated benchmarks for specific work.

## Contractor records

*   [A.D. Paolini LLC](https://leadservicelinecontractors.com/ad-paolini/)
*   [C. Naughton Corp.](https://leadservicelinecontractors.com/cnaughton/)
*   [Commonwealth Construction & Utilities Inc.](https://leadservicelinecontractors.com/commonwealth-construction-utilities/)
*   [Five Star Energy Services](https://leadservicelinecontractors.com/five-star-energy-services/)
*   [J.C. Dillon Inc.](https://leadservicelinecontractors.com/jc-dillon/)
*   [Joseph P. Cardillo & Son Inc.](https://leadservicelinecontractors.com/cardillo-and-son/)
*   [M. DiStasio Excavation Inc.](https://leadservicelinecontractors.com/m-distasio/)
*   [Mass Pipeline Services Inc.](https://leadservicelinecontractors.com/mass-pipeline-services/)

Include the utility, project location, line count, limits of work, restoration standard and target start date.

## Request quotes for your replacement program

Skip the one-by-one emails: Lead Service Line Contractors routes your brief to matching contractors, who answer you directly.

Brief received by Lead Service Line Contractors. Matching contractors reply to your inbox.

Your request didn't go through. Check your email address and try sending it to Lead Service Line Contractors again, or reach us at [hello@leadservicelinecontractors.com](mailto:hello@leadservicelinecontractors.com).

## Questions buyers ask

### What does the East Moline unit price buy?

It prices the customer-side service item. The same schedule has separate lines for taps, curb stops, pavement patching, restoration and traffic control. [Source](https://www.eastmoline.com/DocumentCenter/View/8335/Bid-Tab-002-2026-Lead-Service-Line-Replacement-Plan--Phase-2?bidId=)

### How does Lexington measure copper tubing?

Lexington measures tubing per linear foot, with separate quantities and prices for public and private sides and for each tubing size. [Source](https://www.lexingtonma.gov/DocumentCenter/View/14831/Lexington-Lead-Serivce-Line-Replacement-Project---Bid-Tabulation-and-Check-List?bidId=)

### How should I use these bids when scoping a quote?

Align the footage, pipe diameter, side of the line and restoration items first. Then compare only the matching units and packages. [Source](https://leadservicelinecontractors.com/methodology/#bid-prices)

```json
{"@context":"https://schema.org","@graph":[{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Contractor directory","item":"https://leadservicelinecontractors.com/"},{"@type":"ListItem","position":2,"name":"Municipal bid costs","item":"https://leadservicelinecontractors.com/bid-costs/"}]},{"@type":"ItemList","@id":"https://leadservicelinecontractors.com/bid-costs/#list","name":"What do municipal lead service line replacement bids cost?","numberOfItems":8,"itemListOrder":"https://schema.org/ItemListUnordered","itemListElement":[{"@type":"ListItem","position":1,"name":"A.D. Paolini LLC","url":"https://leadservicelinecontractors.com/ad-paolini/"},{"@type":"ListItem","position":2,"name":"C. Naughton Corp.","url":"https://leadservicelinecontractors.com/cnaughton/"},{"@type":"ListItem","position":3,"name":"Commonwealth Construction & Utilities Inc.","url":"https://leadservicelinecontractors.com/commonwealth-construction-utilities/"},{"@type":"ListItem","position":4,"name":"Five Star Energy Services","url":"https://leadservicelinecontractors.com/five-star-energy-services/"},{"@type":"ListItem","position":5,"name":"J.C. Dillon Inc.","url":"https://leadservicelinecontractors.com/jc-dillon/"},{"@type":"ListItem","position":6,"name":"Joseph P. Cardillo & Son Inc.","url":"https://leadservicelinecontractors.com/cardillo-and-son/"},{"@type":"ListItem","position":7,"name":"M. DiStasio Excavation Inc.","url":"https://leadservicelinecontractors.com/m-distasio/"},{"@type":"ListItem","position":8,"name":"Mass Pipeline Services Inc.","url":"https://leadservicelinecontractors.com/mass-pipeline-services/"}]}]}
{"@context":"https://schema.org","@type":"FAQPage","mainEntity":[{"@type":"Question","name":"What does the East Moline unit price buy?","acceptedAnswer":{"@type":"Answer","text":"It prices the customer-side service item. The same schedule has separate lines for taps, curb stops, pavement patching, restoration and traffic control."}},{"@type":"Question","name":"How does Lexington measure copper tubing?","acceptedAnswer":{"@type":"Answer","text":"Lexington measures tubing per linear foot, with separate quantities and prices for public and private sides and for each tubing size."}},{"@type":"Question","name":"How should I use these bids when scoping a quote?","acceptedAnswer":{"@type":"Answer","text":"Align the footage, pipe diameter, side of the line and restoration items first. Then compare only the matching units and packages."}}]}
```
